Pressure vessel design calculations to ASME VIII, EN 13445 and CODAP
Mechanical design and code checks of your pressure vessels by a specialist engineer, with a complete, traceable calculation report you can defend before your client or the notified body.
Equipment covered
- Horizontal and vertical vessels and drums
- Columns and reactors
- Shell-and-tube heat exchangers (TEMA)
- Pressurised storage vessels, filters and pots
- New equipment, or in-service equipment to be modified or re-rated
Checks performed
- Shells, heads and cones under internal and external pressure
- Flanges and bolted joints
- Nozzle openings and reinforcement
- Local loads on nozzles and attachments (WRC 537 / WRC 297)
- Tubesheets and heat exchanger components
- Supports: skirts, saddles, lugs, anchor bolts and base plates
- Wind, seismic and nozzle loads
- Hydrostatic test conditions
Design codes
Calculations follow the code that applies to your equipment: ASME VIII, EN 13445, CODAP, PD 5500 or AD 2000-Merkblatt, with TEMA for heat exchangers and the requirements of the Pressure Equipment Directive (PED 2014/68/EU) for the European market. Calculations are run in AutoPIPE Vessel.
When to call on me
Design of new equipment
For a fabricator or an engineering company: full mechanical design and a calculation report ready for submission.
Review of a vendor calculation
Independent review of an existing calculation, with a report of findings and recommendations.
Modification or re-rating
New nozzle, revised design conditions, wall thinning: is the vessel still fit for service?
Support with the notified body
Reasoned answers to review comments and report revisions through to close-out.
What you receive
- A complete calculation report: input data, assumptions, load cases, results and conclusions
- The native AutoPIPE Vessel files
- A summary of critical points and recommended modifications
- The report written in English or French
What I need from you
- General arrangement drawing or dimensioned sketch
- Design conditions: pressure, temperature, fluid, corrosion allowance
- Materials and applicable design code
- Nozzle loads, wind and seismic data where applicable
- Project specifications and required deadline
Frequently asked questions
What are the lead times?
They depend on the complexity of the equipment and the quality of the input data. The lead time is set in the quote, before any work starts.
Can you take over a calculation started by someone else?
Yes. I start from the existing report or model, check the assumptions and complete or correct what needs it.
Do you work for clients outside France?
Yes, remotely or on site, in English and French, to European or American codes.
A vessel to design or check?
Send me the drawing and the design conditions: I will come back to you with a free quote and a lead time.